| Number |
Title |
|
|
 |
 |
 |
| News 12 |
ITC 312 H6 - Road tunnel in Sissach, heading through heterogeneous geology |
CH |
2002 |
|
|
|
| News 13 |
ITC 312 VL Progress in the building of railways |
CH |
2003 |
|
|
|
| News 14 |
200 ste Machine |
|
2003 |
|
|
|
| News 15 |
ITC 312 H1 - Subway in Bochum: Two level tunnelling system |
DE |
2003 |
|
|
|
| News 16 |
ITC 312 H3 Mucking in the longest Chinese railway tunnel |
CN |
2003 |
|
|
|
| News 17 |
ITC 312 H3 Railway tunnel in Engelberg, different heading systems |
CH |
2003 |
|
|
|
| News 18 |
ITC 312 H1 Heading in a narrow road escape tunnel in Stuttgart |
DE |
2004 |
|
|
|
| News 19 |
ITC 312 H3 High speed mucking in Norway |
NO |
2004 |
|
|
|
| News 20 |
TE 200 NATM heading in the Wienerwald tunnel |
AT |
2005 |
|
|
|
| News 21 |
ITC 312 H3 Mucking in a HEP tunnel with high water income |
IT |
2005 |
|
|
|
| News 22 |
ITC 312 VL Further progress in ballast loading |
CH |
2005 |
|
|
|
| News 23 |
ITC 312 N1 Heading in the Sand of the subway in Vienna |
AT |
2005 |
|
|
|
| News 24 |
ITC 312 H1 Top heading in hard marl at Koralm tunnel |
AT |
2005 |
|
|
|
| News 25 |
TE 200 Electric excavator in compressed air heading in the Munich subway |
DE |
2005 |
|
|
|
| News 26 |
ITC 312 N1 Heading with pre-cutting method at Chomutov |
KZ |
2005 |
|
|
|
| News 27 |
ITC 120 F2 Heading in a narrow road escape tunnel in Stuttgart, stage II |
DE |
2005 |
|
|
|
| News 28 |
ITC 312 H3 High speed mucking in Innvik (Norway) |
NO |
2005 |
|
|
|
| News 29 |
TE200 NATM Excavation for a pipeline tunnel |
IT |
2006 |
|
|
|
| News 30 |
ITC 120 F2 Mucking and scaling in 32% decline |
AT |
2006 |
|
|
|
| News 31 |
TE 210 NATM Excavation in a railway top heading |
AT |
2006 |
|
|
|
| News 32 |
ITC 312 SL Superloading in Breidall (Norway ) |
NO |
2006 |
|
|
|
| News 33 |
TE210 E Compressed air heading in a cut cover railway tunnel |
AT |
2006 |
|
|
|
| News 34 |
TE210 Tunnel excavator - Ring road in Prag |
CZ |
2007 |
|
|
|
| News 35 |
ITC 312 N1s - Rail-way - Lainzertunnel |
AT |
2007 |
|
|
|
| News 36 |
ITC 10'000A - Gautrain project - South Africa |
ZA |
2007 |
|
|
|
| News 37 |
ITC 312 H3 - Blaustein - Access tunnel for a timestone quarry |
NO |
2008 |
|
|
|
| News 38 |
ITC 312 H6 - Müß tunnel - Hight speed train tunnel |
DE |
2008 |
|
|
|
| News 39 |
ITC 120 F6 - Spillvatten tunnel, Lerum-Partille |
SE |
2008 |
|
|
|
| News 40 |
ITC 312 SL - Kjosnesfjorden |
NO |
2009 |
|
|
|
News 41
|
ITC 312 H6 - Excavation with rock breaker - underground of Paris
|
FR |
2010 |
|
|
|
News 45
|
ITC 120 F3 - Excavation, loading on safety tunnel - Saukopf
|
DE |
2010 |
|
|
|